Changes

Jump to navigation Jump to search
No change in size ,  22:15, 7 December 2019
m
no edit summary
Line 72: Line 72:  
| Hollister
 
| Hollister
 
| 4 hours, 4 minutes
 
| 4 hours, 4 minutes
| First ballast-controlled ZPB. Eventful launch and post-landing. Final location near Tulare, NV.
+
| First ballast-controlled ZPB. Eventful launch and post-landing. Final location near Tulare, CA.
 
|-
 
|-
 
|8
 
|8
157

edits

Navigation menu