Changes

226 bytes added ,  00:11, 7 October 2019
m
no edit summary
Line 59: Line 59:  
| 2 hours
 
| 2 hours
 
| Second flight of in-house constructed polyethylene envelope. Recovered from near Tracy, CA on August 31, 2019.
 
| Second flight of in-house constructed polyethylene envelope. Recovered from near Tracy, CA on August 31, 2019.
 +
|-
 +
|6
 +
! [[SSI-92]]
 +
| October 5, 2019
 +
| Hollister
 +
| 9 hours, 28 minutes
 +
| First polyethylene tubing envelope. First SSI ZPB flight with full telemetry. First interstate Cycloon flight --- recovery from near Alamo, NV pending.
 
|}
 
|}
 +
    
[[Category: High Altitude Balloons]]
 
[[Category: High Altitude Balloons]]
157

edits