Changes

260 bytes added ,  09:05, 6 December 2019
no edit summary
Line 66: Line 66:  
| 9 hours, 28 minutes
 
| 9 hours, 28 minutes
 
| First polyethylene tubing envelope. First SSI ZPB flight with full telemetry. First interstate Cycloon flight. Final location near Alamo, NV.
 
| First polyethylene tubing envelope. First SSI ZPB flight with full telemetry. First interstate Cycloon flight. Final location near Alamo, NV.
 +
|-
 +
|7
 +
! [[SSI-93]]
 +
| October 27, 2019
 +
| Hollister
 +
| 4 hours, 20 minutes
 +
| First ballast-controlled ZPB. Eventful launch and post-landing. Final location near Tulare, NV.
 +
|-
 +
|8
 +
! [[SSI-97]]
 +
| November 17, 2019
 +
| Pigeon Point
 +
| N/A
 +
| Extensive ZPB ground tests.
 
|}
 
|}
       
[[Category: High Altitude Balloons]]
 
[[Category: High Altitude Balloons]]
157

edits