= Design Reviews =
 
= Design Reviews =
  
Line 5: Line 6:
 
This includes a Preliminary Design Review ([https://docs.google.com/presentation/u/1/d/1DXe1mLi3W9Z8g58muUl7w96wpbG8cZbLAWL8znXPc2M/edit#slide=id.p3 PDR]) to assess mission goals, risks, and criteria and is followed by a Critical Design Review (CDR). All stages include extensive criticism and evaluation by other SSI members and external entities. As launch nears, a Flight Readiness Review (FRR) will be conducted, followed by a Launch Readiness Review (LRR). The final stage of the review process is the Post Launch Assessment Review (PLAR).
 
This includes a Preliminary Design Review ([https://docs.google.com/presentation/u/1/d/1DXe1mLi3W9Z8g58muUl7w96wpbG8cZbLAWL8znXPc2M/edit#slide=id.p3 PDR]) to assess mission goals, risks, and criteria and is followed by a Critical Design Review (CDR). All stages include extensive criticism and evaluation by other SSI members and external entities. As launch nears, a Flight Readiness Review (FRR) will be conducted, followed by a Launch Readiness Review (LRR). The final stage of the review process is the Post Launch Assessment Review (PLAR).
  
==PDR==
+
==[[Preliminary Design Review]]==
  
 
Needs description
 
Needs description
  
==CDR==
+
==[[Critical Design Review]]==
  
 
The CDR demonstrates that the maturity of the design is appropriate to support proceeding to full-scale fabrication, assembly, integration, and test and that the technical effort is on track to complete the flight and ground system development and mission operations in order to meet overall performance requirements within the identified cost and schedule constraints. Progress against management plans, budget, and schedule, as well as risk assessment, are presented. The CDR is a review of the final design of the launch vehicle and payload system. All analyses should be complete and some critical testing should be complete.
 
The CDR demonstrates that the maturity of the design is appropriate to support proceeding to full-scale fabrication, assembly, integration, and test and that the technical effort is on track to complete the flight and ground system development and mission operations in order to meet overall performance requirements within the identified cost and schedule constraints. Progress against management plans, budget, and schedule, as well as risk assessment, are presented. The CDR is a review of the final design of the launch vehicle and payload system. All analyses should be complete and some critical testing should be complete.
  
==FRR==
+
==[[Flight Readiness Review]]==
  
 
The FRR examines tests, demonstrations, analyses, and audits that determine the overall system (all projects working together) readiness for a safe and successful flight/launch and for subsequent flight operations of the as-built rocket and payload system. It ensures that all flight and ground hardware, software, personnel, and procedures are operationally ready. See specific guidelines and expectations produced by [http://www.nasa.gov/pdf/213881main_SLI_FRR.pdf NASA].
 
The FRR examines tests, demonstrations, analyses, and audits that determine the overall system (all projects working together) readiness for a safe and successful flight/launch and for subsequent flight operations of the as-built rocket and payload system. It ensures that all flight and ground hardware, software, personnel, and procedures are operationally ready. See specific guidelines and expectations produced by [http://www.nasa.gov/pdf/213881main_SLI_FRR.pdf NASA].
Line 19: Line 20:
 
Furthermore, please note that launch-site safety officers will also be present to approve and assess your rockets.
 
Furthermore, please note that launch-site safety officers will also be present to approve and assess your rockets.
  
==PLAR==
+
==[[Post Launch Assessment Review]]==
 
[Add PLAR summary]
 
[Add PLAR summary]
  
Line 25: Line 26:
  
 
[https://www.nasa.gov/pdf/672448main_SLP_2012-2013.pdf ''2012-2013 NASA SLP '']
 
[https://www.nasa.gov/pdf/672448main_SLP_2012-2013.pdf ''2012-2013 NASA SLP '']
 +
 +
[[Category:Rockets]]

Revision as of 09:44, 2 February 2016

PegasusPDRCover.png

Design Reviews

As specified in NASA’s engineering design life cycle, multiple design reviews are used to assess the feasibility and practicality of both attempting and accomplishing a particular project. We follow a modified version of their practices.

This includes a Preliminary Design Review (PDR) to assess mission goals, risks, and criteria and is followed by a Critical Design Review (CDR). All stages include extensive criticism and evaluation by other SSI members and external entities. As launch nears, a Flight Readiness Review (FRR) will be conducted, followed by a Launch Readiness Review (LRR). The final stage of the review process is the Post Launch Assessment Review (PLAR).

Preliminary Design Review

Needs description

Critical Design Review

The CDR demonstrates that the maturity of the design is appropriate to support proceeding to full-scale fabrication, assembly, integration, and test and that the technical effort is on track to complete the flight and ground system development and mission operations in order to meet overall performance requirements within the identified cost and schedule constraints. Progress against management plans, budget, and schedule, as well as risk assessment, are presented. The CDR is a review of the final design of the launch vehicle and payload system. All analyses should be complete and some critical testing should be complete.

Flight Readiness Review

The FRR examines tests, demonstrations, analyses, and audits that determine the overall system (all projects working together) readiness for a safe and successful flight/launch and for subsequent flight operations of the as-built rocket and payload system. It ensures that all flight and ground hardware, software, personnel, and procedures are operationally ready. See specific guidelines and expectations produced by NASA.

Furthermore, please note that launch-site safety officers will also be present to approve and assess your rockets.

Post Launch Assessment Review

[Add PLAR summary]

Sources:

2012-2013 NASA SLP