User contributions
23 March 2016
Altimeters
StrataLogger: added another link
+59
Altimeters
Raven: added a link
+78
Category:Daedalus
no edit summary
m+359
Category:Daedalus
no edit summary
m+24
Pegasus
no edit summary
m+23
Charybdis
no edit summary
m+23
Prometheus
no edit summary
m+23
Category:Daedalus
making the page
Talos
no edit summary
m+23
Pegasus
Budget: removed it
-828
Prometheus
no edit summary
m-14
Prometheus
removed budget section
-2,106
6 March 2016
5 March 2016
Launch Day
no edit summary
m-65
L1 Certification
no edit summary
m+113
Launch Day
yay new page
L1 Certification
Launch Day Procedures: moving to its own page
-17,730
HPR Background Information
no edit summary
m+75
HPR Background Information
no edit summary
m+13
L1 Certification
no edit summary
m+8
HPR Background Information
added intro
+199
HPR Background Information
no edit summary
m+23
HPR Background Information
added info here
L1 Certification
Background Information: removed this section
-12,017
Rockets Launch Procedure
no edit summary
m+148
Rockets Launch Procedure
added more more more things
+774
Rockets Launch Procedure
added more things
+145
Rockets Launch Procedure
no edit summary
m+371
Rockets Launch Procedure
no edit summary
m-12
Rockets Launch Procedure
Basic Requirements: created the page and added things
-6
Rockets Launch Procedure
Created page with "This is what you need to do in order to launch a rocket with us. Note: SSI does subsidize a substantial portion of the cost to launch and build rockets. =Basic Requirements=..."
8 February 2016
L2 Post-Flight Analyses
created page
Rockets Team
Replacing random rocket with Cardinal II.
-61
File:CardinalIILaunch.jpg
A Firestorm 54 carrying a Raven 3 attempting to certify for L2.
2 February 2016
Project Daedalus
no edit summary
m-8
The Design Process
no edit summary
m+7
The Design Process
Added caption to the link
-15
The Design Process
no edit summary
m-27
The Design Process
no edit summary
m+41
File:PegasusPDRCover.png
Iangomez uploaded a new version of File:PegasusPDRCover.png
The Design Process
broke some things
+171
File:PegasusPDRCover.png
no edit summary
The Design Process
no edit summary
m+8
The Design Process
Design Reviews: adding headers
m+97
The Design Process
made this thing readable
-39,599
The Design Process
Design Reviews
m-1,553
The Design Process
creation
L1 Certification
Final Steps
m+4
L1 Certification
Motor Retention (Positive or Otherwise) and Adaptors
m+98