The mission will be considered successful if the rocket unit reaches spin stabilization, demonstrates successful de-spin prior to reaching apogee. The rocket must be recovered intact and reusable and pass the L3 certification inspection authorized by Tripoli. | The mission will be considered successful if the rocket unit reaches spin stabilization, demonstrates successful de-spin prior to reaching apogee. The rocket must be recovered intact and reusable and pass the L3 certification inspection authorized by Tripoli. |