= Objectives, Requirements. and Exposition =
 
= Objectives, Requirements. and Exposition =
   −
To teach design principles of high power rocketry with hands-on experience. Teams will design and launch novel rocket concepts iteratively, starting from L1, L2 and finally ending with an L3 rocket that successfully flies the thoroughly tested design. The technology coming out of this project will benefit the Rockets Team’s flagship rocketry project.<br />
+
To teach design principles of high power rocketry with hands-on experience. Teams will design and launch novel rocket concepts iteratively, starting with L1, L2 and finally ending with an L3 rocket that successfully flies the thoroughly tested design. The technology coming out of this project will benefit the Rockets Team’s flagship rocketry project.<br />
   −
Each team will undertake the long process and end up with an L3 built from scratch. Documentation of the process is a crucial aspect of Daedalus. Explaining pitfalls, triumphs, and the minutiae of designing a fully functional rocket will aid and speed up the process for future teams. Each team will go through a five stage development cycle: 1. research, 2. preliminary design, 3. design, 4. testing and documentation review, 5. build and launch. The milestones will focus on providing hardware - not presentations.<br />
+
Documentation of the process is a crucial aspect of Daedalus. Explaining pitfalls, triumphs, and the minutiae of designing a fully functional rocket will aid and speed up the process for future teams. Each team will go through a five stage development cycle: 1. research, 2. preliminary design, 3. critical design, 4. testing and documentation review, 5. build and launch. The milestones will focus on providing hardware - not presentations.<br />
    
# The rocket will be certified through [https://en.wikipedia.org/wiki/Tripoli_Rocketry_Association Tripoli Rocketry Association] or the [https://en.wikipedia.org/wiki/National_Association_of_Rocketry National Association of Rocketry]
 
# The rocket will be certified through [https://en.wikipedia.org/wiki/Tripoli_Rocketry_Association Tripoli Rocketry Association] or the [https://en.wikipedia.org/wiki/National_Association_of_Rocketry National Association of Rocketry]
Line 32: Line 32:       −
== Phase 2. Hardware Testing and Initial Design Reviews ==
+
== Phase 2. Hardware Testing and Critical Design Reviews ==
    
<ul>
 
<ul>
Line 45: Line 45:  
Certification launches will be done at the Tripoli Central California launch days (every third Saturday of the month). LUNAR holds launches at Snow Ranch every first Saturday of the month; these will serve as backup launch dates (or extra testing dates if failure occurs). See schedule for more specifics.</p></li></ul>
 
Certification launches will be done at the Tripoli Central California launch days (every third Saturday of the month). LUNAR holds launches at Snow Ranch every first Saturday of the month; these will serve as backup launch dates (or extra testing dates if failure occurs). See schedule for more specifics.</p></li></ul>
   −
== Phase 3. Final Reviews, Build, and L3 Launch ==
+
== Phase 3. Build, Flight Readiness Review, and L3 Launch ==
    
* Finish final CDR and freeze design work completely.
 
* Finish final CDR and freeze design work completely.