Changes

Jump to navigation Jump to search
579 bytes added ,  05:29, 15 July 2018
no edit summary
Line 1: Line 1:  
{{HABEES-sidebar
 
{{HABEES-sidebar
 
| header = Cupcake
 
| header = Cupcake
| img link = File:appleturnover.png
+
| img link = File:Gen5bms_s.PNG
 
| designer = Zachary Belateche
 
| designer = Zachary Belateche
 
| techline = Balloons Core Power
 
| techline = Balloons Core Power
Line 28: Line 28:  
* inboard heater
 
* inboard heater
 
* Status LEDs for charging indicator and faults
 
* Status LEDs for charging indicator and faults
 +
 +
== Testing ==
 +
Cupcake is planned to be assembled in the fall of the 2018-2019 academic year, with the first launch planned for Winter 2019.
 +
 +
== Schematics ==
 +
<gallery  widths=200px heights=200px>
 +
File:g3_top.PNG | <center> Top Sheet </center>
 +
File:g3_ldo.PNG | <center> Batteries </center>
 +
File:g3_boost.PNG | <center> Boost </center>
 +
File:g3_output_connectors.PNG | <center> Output Connectors </center>
 +
File:g3_protector.PNG | <center> Protector </center>
 +
File:g3_tmon.PNG | <center> Temperature Monitor </center>
 +
File:g3_usbcharger.PNG | <center> USB Charger </center>
 +
</gallery>
51

edits

Navigation menu