Changes

Jump to navigation Jump to search
75 bytes added ,  21:17, 21 September 2021
Line 1: Line 1:  +
{{problems}}
 +
 
=[[Mission Control]]=
 
=[[Mission Control]]=
   −
Durand 390 is SSI's headquarters.
+
Durand 390 used to be SSI's main workspace, until we moved to ESIII (in early 2017?)
    
=[[Durand 354 | 354]]=
 
=[[Durand 354 | 354]]=
Line 18: Line 20:  
[link to campus map for durand Here is the associated campus-map.stanford.edu location.]
 
[link to campus map for durand Here is the associated campus-map.stanford.edu location.]
   −
 
+
[[Category:Operations]]
{{problems}}
 

Navigation menu