Changes

Jump to navigation Jump to search
291 bytes added ,  00:20, 23 March 2016
Line 125: Line 125:     
= L1 Requirements =
 
= L1 Requirements =
 +
 +
[[File:Rocket_Launch_Pad_Group.jpg|thumb|600px|right|Four L1 certification rockets on the pad at SSI-R1 at Snow Ranch]]
    
Sources of information: [http://www.tripoli.org/Level1 TRA L1 certification info] and [http://www.nar.org/high-power-rocketry-info/level-1-hpr-certification/ NAR L1 certification info].
 
Sources of information: [http://www.tripoli.org/Level1 TRA L1 certification info] and [http://www.nar.org/high-power-rocketry-info/level-1-hpr-certification/ NAR L1 certification info].
Line 187: Line 189:     
You must mail in your certification form to have the rocketry association acknowledge your achievement. These are the addresses of NAR and TRA.
 
You must mail in your certification form to have the rocketry association acknowledge your achievement. These are the addresses of NAR and TRA.
 +
 +
National Association of Rocketry HQ <br/>
 +
P.O. Box 407 <br/>
 +
Marion, IA 52302<br/><br/>
 +
 +
Tripoli Rocketry Association, Inc.<br/>
 +
P.O. Box 87<br/>
 +
Bellevue, NE 6800<br/>
    
=== Clean Up ===
 
=== Clean Up ===
117

edits

Navigation menu