Changes

Jump to navigation Jump to search
17 bytes added ,  07:42, 26 January 2016
m
no edit summary
Line 76: Line 76:     
Following the launch, the rocket will be inspected; should the airframe be deemed suitable for flight given a new motor, it will have passed L1 certification. Failed deployment, motor cato, drifting beyond a particular range (see launch officer), or the violation of other safety codes will result in a failure. L1 certification, however, is an excellent introduction to the basic operations of rockets and recovery! See [[Pegasus|Pegasus]] for a description of an L1 rocket used as a testbed for an L3 concept.
 
Following the launch, the rocket will be inspected; should the airframe be deemed suitable for flight given a new motor, it will have passed L1 certification. Failed deployment, motor cato, drifting beyond a particular range (see launch officer), or the violation of other safety codes will result in a failure. L1 certification, however, is an excellent introduction to the basic operations of rockets and recovery! See [[Pegasus|Pegasus]] for a description of an L1 rocket used as a testbed for an L3 concept.
 +
 +
= Final Steps =
    
== Mailing It In ==
 
== Mailing It In ==
    
You must mail in your certification form to have the rocketry association acknowledge your achievement. These are the addresses of NAR and TRA.
 
You must mail in your certification form to have the rocketry association acknowledge your achievement. These are the addresses of NAR and TRA.
303

edits

Navigation menu