Changes

Jump to navigation Jump to search
26 bytes added ,  07:13, 26 January 2016
moved information under correct headers
Line 8: Line 8:  
* No electronics or altimeter is required.  
 
* No electronics or altimeter is required.  
   −
Following the launch, the rocket will be inspected; should the airframe be deemed suitable for flight given a new motor, it will have passed L1 certification. Failed deployment, motor cato, drifting beyond a particular range (see launch officer), or the violation of other safety codes will result in a failure. L1 certification, however, is an excellent introduction to the basic operations of rockets and recovery! See [[Pegasus|Pegasus]] for a description of an L1 rocket used as a testbed for an L3 concept.
      
= Launch Day Procedures =
 
= Launch Day Procedures =
Line 17: Line 16:     
== Launch Pad Procedure ==
 
== Launch Pad Procedure ==
 +
 +
= Success and Failure =
 +
 +
Following the launch, the rocket will be inspected; should the airframe be deemed suitable for flight given a new motor, it will have passed L1 certification. Failed deployment, motor cato, drifting beyond a particular range (see launch officer), or the violation of other safety codes will result in a failure. L1 certification, however, is an excellent introduction to the basic operations of rockets and recovery! See [[Pegasus|Pegasus]] for a description of an L1 rocket used as a testbed for an L3 concept.
303

edits

Navigation menu