Changes

Jump to navigation Jump to search
51 bytes added ,  07:16, 26 January 2016
More headers
Line 13: Line 13:  
= Launch Day Procedures =
 
= Launch Day Procedures =
   −
== Range Safety Check ==
+
== Packing Your Parachute ==
    
== Prepping Your Motor ==
 
== Prepping Your Motor ==
 +
 +
== Range Safety Check ==
    
== Launch Pad Procedure ==
 
== Launch Pad Procedure ==
Line 22: Line 24:     
Following the launch, the rocket will be inspected; should the airframe be deemed suitable for flight given a new motor, it will have passed L1 certification. Failed deployment, motor cato, drifting beyond a particular range (see launch officer), or the violation of other safety codes will result in a failure. L1 certification, however, is an excellent introduction to the basic operations of rockets and recovery! See [[Pegasus|Pegasus]] for a description of an L1 rocket used as a testbed for an L3 concept.
 
Following the launch, the rocket will be inspected; should the airframe be deemed suitable for flight given a new motor, it will have passed L1 certification. Failed deployment, motor cato, drifting beyond a particular range (see launch officer), or the violation of other safety codes will result in a failure. L1 certification, however, is an excellent introduction to the basic operations of rockets and recovery! See [[Pegasus|Pegasus]] for a description of an L1 rocket used as a testbed for an L3 concept.
 +
 +
== Mailing It In ==
303

edits

Navigation menu