Changes

1 byte removed ,  22:42, 27 October 2015
no edit summary
Line 16: Line 16:  
==Pre-Launch==
 
==Pre-Launch==
 
The design and coding of the payload went well due to the hard work of the team and their mentors. The team struggled with getting the nichrome wire experiment to work the night before the launch and therefore it was not included in the final payload. In addition, on the day of the launch the key-chain camera experienced software problems and did not function during the flight.  
 
The design and coding of the payload went well due to the hard work of the team and their mentors. The team struggled with getting the nichrome wire experiment to work the night before the launch and therefore it was not included in the final payload. In addition, on the day of the launch the key-chain camera experienced software problems and did not function during the flight.  
      
==Flight==
 
==Flight==
2

edits