Line 6: |
Line 6: |
| | | |
| The FRR examines tests, demonstrations, analyses, and audits that determine the overall system (all projects working together) readiness for a safe and successful flight/launch and for subsequent flight operations of the as-built rocket and payload system. It ensures that all flight and ground hardware, software, personnel, and procedures are operationally ready. See specific guidelines and expectations produced by [http://www.nasa.gov/pdf/213881main_SLI_FRR.pdf NASA]. | | The FRR examines tests, demonstrations, analyses, and audits that determine the overall system (all projects working together) readiness for a safe and successful flight/launch and for subsequent flight operations of the as-built rocket and payload system. It ensures that all flight and ground hardware, software, personnel, and procedures are operationally ready. See specific guidelines and expectations produced by [http://www.nasa.gov/pdf/213881main_SLI_FRR.pdf NASA]. |
− |
| |
− | ''The FRR should be structured in the following format'':
| |
− |
| |
− | <ol style="list-style-type: decimal;">
| |
− | <li><blockquote><p>General overview</p></blockquote>
| |
− | <ol style="list-style-type: lower-alpha;">
| |
− | <li><blockquote><p>Team summary, motor choice, deployment system (high level overview)</p></blockquote></li></ol>
| |
− | </li>
| |
− | <li><blockquote><p>All changes since CDR</p></blockquote></li>
| |
− | <li><blockquote><p>Vehicle Testing and Design</p></blockquote></li>
| |
− | <li><blockquote><p>Payload Criteria</p></blockquote></li>
| |
− | <li><blockquote><p>Launch Operations</p></blockquote></li></ol>
| |
− |
| |
− | <ul>
| |
− | <li><blockquote><p>Deployment tests with ejection charges</p></blockquote></li>
| |
− | <li><blockquote><p>Flight profile simulations based on rocket manufacturing</p></blockquote></li>
| |
− | <li><blockquote><p>Ground station and avionics testing</p></blockquote></li>
| |
− | <li><blockquote><p>Quality of construction and manufacturing</p></blockquote>
| |
− | <ul>
| |
− | <li><blockquote><p>Aesthetics, neatness</p></blockquote></li>
| |
− | <li><blockquote><p>Strength of construction, attachment integrity</p></blockquote></li>
| |
− | <li><blockquote><p>Strength of load-bearing parts, quality of seals</p></blockquote></li></ul>
| |
− | </li>
| |
− | <li><blockquote><p>Failure analysis</p></blockquote>
| |
− | <ul>
| |
− | <li><blockquote><p>Failures modes, causes, effects, and mitigation</p></blockquote></li></ul>
| |
− | </li></ul>
| |
| | | |
| Furthermore, please note that launch-site safety officers will also be present to approve and assess your rockets. | | Furthermore, please note that launch-site safety officers will also be present to approve and assess your rockets. |
| | | |
| [Add PLAR summary] | | [Add PLAR summary] |
− |
| |
− | The rest of this document will be the templates of each review and explanations of exactly what is required per section. There will be page breaks between each document.
| |
− |
| |
− | Formatted by:
| |
− |
| |
− | Ian Gomez
| |
− |
| |
− | Andrew Milich
| |
− |
| |
− | Logan Herrera
| |
| | | |
| Sources: | | Sources: |