Line 167: Line 167:     
Every team will have a team lead and a concept design lead. Team lead responsibilities have been outlined above in the Phase 1 section. They will be in close contact with the current project managers. Concept design leads will maintain domain over the integration of the advanced concept. Work to be divided up as each team sees fit. The designation for this mission is ARES, which stands for Advanced Rocketry and Experimental Systems.<br />
 
Every team will have a team lead and a concept design lead. Team lead responsibilities have been outlined above in the Phase 1 section. They will be in close contact with the current project managers. Concept design leads will maintain domain over the integration of the advanced concept. Work to be divided up as each team sees fit. The designation for this mission is ARES, which stands for Advanced Rocketry and Experimental Systems.<br />
      
== ARES-1 ==
 
== ARES-1 ==
    
ARES-1, code name ''Talos'', is the designation for the rocket which will be at testbed for the avionics suite.<br />
 
ARES-1, code name ''Talos'', is the designation for the rocket which will be at testbed for the avionics suite.<br />
      
== ARES-2 ==
 
== ARES-2 ==
    
ARES-2, code name ''Pegasus'', is the designation for the rocket which will test a parafoil descent system.<br />
 
ARES-2, code name ''Pegasus'', is the designation for the rocket which will test a parafoil descent system.<br />
      
== ARES-3 ==
 
== ARES-3 ==
    
ARES-3, code name ''Charybdis'', is the designation for the rocket which will use canted fins.<br />
 
ARES-3, code name ''Charybdis'', is the designation for the rocket which will use canted fins.<br />
      
== ARES-4 ==
 
== ARES-4 ==