Changes

Jump to navigation Jump to search
m
→‎Putting It All Together: clarified that other manufacturers also do DfM, but they do it differently
Line 62: Line 62:     
=== PCB Fabrication ===
 
=== PCB Fabrication ===
''This guide assumes you're ordering from Bay Area Circuits. For other manufacturers, some of the process will be different, though you will still ultimately provide your manufacturer with your ZIP of Gerber files''
+
''This guide assumes you're ordering from Bay Area Circuits. For other manufacturers, the DfM process will be different, though you will still ultimately provide your manufacturer with your ZIP of Gerber files''
    
The first step in getting your board ordered is a manufacturability check, to verify you have all of the required files and the manufacturer can read them and actually make the board they describe. Bay Area Circuits (BAC) has a Design for Manufacturability (DfM) tool that automatically reads and interprets fabrication ZIPs to make sure the boards have a full set of files and can be built. Go to the [http://instantdfm.bayareacircuits.com InstantDfM] page and follow the instructions to upload your fabrication ZIP. Once you submit, you'll have to wait usually around 10 minutes (shorter for simpler boards, longer for more complicated/four-layer boards) for processing. You'll be emailed a link when your board has finished being evaluated. The link will go to a page like the first below:
 
The first step in getting your board ordered is a manufacturability check, to verify you have all of the required files and the manufacturer can read them and actually make the board they describe. Bay Area Circuits (BAC) has a Design for Manufacturability (DfM) tool that automatically reads and interprets fabrication ZIPs to make sure the boards have a full set of files and can be built. Go to the [http://instantdfm.bayareacircuits.com InstantDfM] page and follow the instructions to upload your fabrication ZIP. Once you submit, you'll have to wait usually around 10 minutes (shorter for simpler boards, longer for more complicated/four-layer boards) for processing. You'll be emailed a link when your board has finished being evaluated. The link will go to a page like the first below:
767

edits

Navigation menu