Changes

Jump to navigation Jump to search
104 bytes added ,  07:09, 26 January 2016
Added headers
Line 9: Line 9:     
Following the launch, the rocket will be inspected; should the airframe be deemed suitable for flight given a new motor, it will have passed L1 certification. Failed deployment, motor cato, drifting beyond a particular range (see launch officer), or the violation of other safety codes will result in a failure. L1 certification, however, is an excellent introduction to the basic operations of rockets and recovery! See [[Pegasus|Pegasus]] for a description of an L1 rocket used as a testbed for an L3 concept.
 
Following the launch, the rocket will be inspected; should the airframe be deemed suitable for flight given a new motor, it will have passed L1 certification. Failed deployment, motor cato, drifting beyond a particular range (see launch officer), or the violation of other safety codes will result in a failure. L1 certification, however, is an excellent introduction to the basic operations of rockets and recovery! See [[Pegasus|Pegasus]] for a description of an L1 rocket used as a testbed for an L3 concept.
 +
 +
== Launch Day Procedures ==
 +
 +
= Range Safety Check =
 +
 +
= Prepping Your Motor =
 +
 +
= Launch Pad Procedure =
303

edits

Navigation menu