Changes

14 bytes added ,  07:10, 26 January 2016
m
no edit summary
Line 10: Line 10:  
Following the launch, the rocket will be inspected; should the airframe be deemed suitable for flight given a new motor, it will have passed L1 certification. Failed deployment, motor cato, drifting beyond a particular range (see launch officer), or the violation of other safety codes will result in a failure. L1 certification, however, is an excellent introduction to the basic operations of rockets and recovery! See [[Pegasus|Pegasus]] for a description of an L1 rocket used as a testbed for an L3 concept.
 
Following the launch, the rocket will be inspected; should the airframe be deemed suitable for flight given a new motor, it will have passed L1 certification. Failed deployment, motor cato, drifting beyond a particular range (see launch officer), or the violation of other safety codes will result in a failure. L1 certification, however, is an excellent introduction to the basic operations of rockets and recovery! See [[Pegasus|Pegasus]] for a description of an L1 rocket used as a testbed for an L3 concept.
   −
== Launch Day Procedures ==
+
=== Launch Day Procedures ===
   −
= Range Safety Check =
+
=== Range Safety Check ===
   −
= Prepping Your Motor =
+
=== Prepping Your Motor ===
   −
= Launch Pad Procedure =
+
=== Launch Pad Procedure ===
303

edits